ORDER THE PARTS YOU NEED OR SCHEDULE A REBUILD: Call (419)368-7020

Home
ABOUT US
  • CONTACT US
  • STAY CONNECTED
  • PAVING THE WAY
  • OUR CUSTOMERS
PARTS & PAVERS FOR SALE
  • OUR eBay
  • EQUIPMENT FOR SALE
  • MONTHLY SPECIAL
SERVICES
  • OUR SERVICES
  • PAVER REBUILD PROCESS
UPGRADES & MANUALS
  • PARTS UPGRADES
  • FORMS & CHARTS
  • PARTS MANUALS
  • EQUIPMENT SPEC PDFS
MVE PHOTOS
  • REBUILT ASPHALT PAVERS
  • GALLERY
Home
ABOUT US
  • CONTACT US
  • STAY CONNECTED
  • PAVING THE WAY
  • OUR CUSTOMERS
PARTS & PAVERS FOR SALE
  • OUR eBay
  • EQUIPMENT FOR SALE
  • MONTHLY SPECIAL
SERVICES
  • OUR SERVICES
  • PAVER REBUILD PROCESS
UPGRADES & MANUALS
  • PARTS UPGRADES
  • FORMS & CHARTS
  • PARTS MANUALS
  • EQUIPMENT SPEC PDFS
MVE PHOTOS
  • REBUILT ASPHALT PAVERS
  • GALLERY
More
  • Home
  • ABOUT US
    • CONTACT US
    • STAY CONNECTED
    • PAVING THE WAY
    • OUR CUSTOMERS
  • PARTS & PAVERS FOR SALE
    • OUR eBay
    • EQUIPMENT FOR SALE
    • MONTHLY SPECIAL
  • SERVICES
    • OUR SERVICES
    • PAVER REBUILD PROCESS
  • UPGRADES & MANUALS
    • PARTS UPGRADES
    • FORMS & CHARTS
    • PARTS MANUALS
    • EQUIPMENT SPEC PDFS
  • MVE PHOTOS
    • REBUILT ASPHALT PAVERS
    • GALLERY
  • Home
  • ABOUT US
    • CONTACT US
    • STAY CONNECTED
    • PAVING THE WAY
    • OUR CUSTOMERS
  • PARTS & PAVERS FOR SALE
    • OUR eBay
    • EQUIPMENT FOR SALE
    • MONTHLY SPECIAL
  • SERVICES
    • OUR SERVICES
    • PAVER REBUILD PROCESS
  • UPGRADES & MANUALS
    • PARTS UPGRADES
    • FORMS & CHARTS
    • PARTS MANUALS
    • EQUIPMENT SPEC PDFS
  • MVE PHOTOS
    • REBUILT ASPHALT PAVERS
    • GALLERY

Take a Look at our Paver Process!

OUR REBUILD PROCESS: Rolling Into the Rebuild

Phase 1: Arrival

Phase 2: Start The Disassembly

A CR662RM has arrived at MVE.

Phase 2: Start The Disassembly

Phase 2: Start The Disassembly

We begin tearing down the machine.

 Removed and tagged parts.

Hood is being torn down.

Pumps and motors removed and tagged.

Disassemble the screed.

OUR REBUILD PROCESS: Better Roads Ahead

Steering panels and control boxes are pulled and will be thoroughly rebuilt with new components.

Chains removed, to be replaced.

Hydraulic hoses are being replaced.

Hopper and related parts are removed.

Getting ready to take off the worn wheels.

The old engine is taken out.

OUR REBUILD PROCESS: Patching Up the Problems

Phase 3: Replace and Repaint

Phase 3: Replace and Repaint

Additional parts removed and getting ready for new paint.

Phase 3: Replace and Repaint

Phase 3: Replace and Repaint

Phase 3: Replace and Repaint

All new harnesses and cables are ready to go on the machine.

Phase 3: Replace and Repaint

Freshly painted frame.

Rebuild the control box.

Organized the new control box.

New pumps and hose reel installed.

OUR REBUILD PROCESS: Solid Work for Solid Roads

Phase 4: Install the New & Rebuilt Parts

New tires are installed.

The new hopper is placed.

New main control box assembled.

New hood installed.

Freshly painted parts that are ready to go on the machine.

Chromium carbide liners are in.

OUR REBUILD PROCESS: Getting the Paver Back on Track

Phase 6: Test Drive and Send to Customer

New tracks are installed.

Phase 6: Test Drive and Send to Customer

New engine assembled and installed.

Phase 6: Test Drive and Send to Customer

Phase 6: Test Drive and Send to Customer

Phase 6: Test Drive and Send to Customer

Test driving the paver ensures everything runs smoothly, and then the paver is on its way.

Our Rebuild Process Video:

Copyright © 2026 Mohican Valley Equipment - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept