A CR662RM has arrived at MVE.
Tear down has began.

Parts removed and tagged.
Hood is being torn down.

Pumps and motors removed and tagged.

Disassemble the screed.

Steering panels and control boxes have been pulled and will be thoroughly rebuilt with new components.

Old chains removed, ready to be replaced.

Hydraulic hoses are taken out.

Hopper and related parts are removed.

Getting ready to take off the worn wheels.

The old engine is taken out.

Additional parts removed, tagged, and ready for new paint.

New harnesses and cables are ready to go on the machine.

Freshly painted frame.

Rebuild the control box.

Organized the new control box.

New pumps and hose reel installed.

New tires are installed.
The new hopper is placed.

New main control box assembled.

New hood installed.

Freshly painted parts that are ready to go on the machine.

Chromium carbide liners are in.

New tracks are installed.

New Cummins engine assembled and installed.

Test driving the paver ensures everything runs smoothly, and then the paver is on its way.